This
hanger is specialized to hang and convey DN1000~DN2600 cast iron
pipes casted from hot mold.
Main
function introduced as bellow:
-
Conveying pipes right after casting to annealing furnace as
soon as possible
-
As
temperature of pipes is still 700¡æ~800¡æ
right after
casting out and pipes is easy to be deformed, it is imperative
to make pipes rotate itself along with its¡¯ length axle during
hanging and conveying
Main
purposes are:
-
In
order to reduce cost of production, calorific value remained in
pipes after casting has to be re-utilized, thus time of heating
in annealing process will be shortened a lot and utilization of
fuel will be improved greatly.
-
Pipes
pulled from centrifugal casting machine should be moved to next
process sooner in order to improve working efficiency of
centrifugal casting machine.
|