|
After
mortar maintaining and solidifying, pipes should be coated on
external and internal surface, marked and packed before storing and
delivering. Those are belong to section of package process. How
reasonable of process arranging and what level of machinery equipped
will affect directly quality of out-looking, anti-corrosion and
durability of pipes. Now day, coating on internal and external
surface of pipes adopts method of auto coating after pre-heating
pipes and drying in the end.
Photos above show auto-coating line of pipes designed and
manufactured by ours. It mainly consist of trimming of pipe socket
end, pre-heating furnace, external coating facility and drying
furnace.
Technological process:
soket
end trimming→pre-heating→internal coating→external
coating→drying→marking
→packing→delivering
the
advanced central control system is adopted in coating line to
guarantee steadily and reliable running, high efficiency and high
ratio of fuel utilization. Good quality of coating is proved from:
-
Bright and smooth coating internal and external surface
-
No
peel and bubble on coating layer
-
Good integration between coating layer and base of pipes
External and internal anti-corrosive standards are fully conformed
due to excellent performance of coating line.
|